Documents Internal Correspondence AS-PUB-2011-0046
PUBLIC
BULLETIN
OPS BOARD — NLVFAC-7 --:--:-- · MARCUS WEBB FACILITIES --:--:-- · UNIT 9182 --:--:-- FACILITIES — Parking Lot B resurfacing Tuesday through Thursday. Use Lot C; the shuttle runs every ten minutes. HR — Open enrollment closes Friday. Benefits office hours are posted on Level 2. CAFETERIA — Hours extended to 19:30 Monday to Thursday for the duration of the Q4 test schedule. RELEASED — AS-RPT-2018-0127: Power System Analysis — 2018 Q3 FACILITIES — Elevator 3 is out of service for inspection. Please use the east stairwell. SECURITY — Badges expiring this quarter must be renewed at Building 2 reception. Bring a second form of ID. RECORDS — The clean-desk policy applies to all secure areas. Lock your cabinets at end of shift. STATION ACTIVITY — month to date
This document contains 3 section(s) you do not hold a grant to read. To request elevated access, contact your program administrator.
UNCLASSIFIED // APPROVED FOR PUBLIC RELEASE
Aether Advanced Systems Corp — Foundry Division
DOCUMENT REF: AS-PUB-2011-0046

NOTICE OF LAND USE — RENEWAL
Lease NV-████-0071 | Nye County, Nevada

DESCRIPTION OF USE:
Geothermal gradient survey and subsurface thermal research, including associated support structures, access roads, and instrumentation housings.

SURFACE DISTURBANCE: 14.2 acres (no change from prior term)
SUBSURFACE WORKS: ████████████████████████
PERSONNEL ON SITE (AVERAGE): ██████████████

PUBLIC COMMENT:
No comments were received during the thirty (30) day period. The renewal is granted on the terms of the original instrument.

Note: this facility is identified in correspondence as the Nevada Valley Geothermal Station. Internal designation NLVFAC-7 is used in technical records and does not appear in public filings.

A work of fiction. Aether Advanced Systems is an in-world website for The Fractured Sky Trilogy by Kyle Sands — information about the books is available at kylesands.com, and readers gather at community.kylesands.com.